Routing Settings

Control which factors influence assignment and route sequencing

network_node

Active Profile

Balanced Optimization Modified

warning Pending changes will affect 14 active routes.

Last Updated

Today, 08:30 AM (S. Connor)

group_work Assignment Factors

Global Constraints

Prefer closest available technician.

0
75 Soft

Keep tech near assigned home hub.

0
30 Soft

Distribute jobs evenly across shift.

0
50 Soft

lock
Capability Match Matches Phlebotomy/X-Ray skills
Hard
lock
Shift Availability Tech must be on shift
Hard

schedule Time & Priority Factors

Active
Weight: 95
Weight: 80
Weight: 85

Timed Draw Strictness

science Lab & Stability

High Priority

Weightage given to sample decay risk.


Auto-insert Lab Drops If load > 80% capacity

sync Re-optimization

Minimal Disruption Prevent changing active stops

40%

Discourage assigning to techs with old GPS data.

psychology AI Decision Preview

How the system explains choices with current settings.

Sample Scenario: #1255 Urgent Care

"Why was Technician B assigned instead of Technician A (who was closer)?"

lightbulb

STAT Urgency Outweighed Distance

Although Tech A was 2 miles closer, Tech B has a higher probability of meeting the STAT window (Weight: 95) due to current traffic conditions.

block

Availability Constraint

Tech C was excluded due to Shift Availability (Hard Lock) ending before job completion.

Scoring Breakdown

SLA Adherence 98/100
Travel Efficiency 72/100
Workload Balance 85/100