Incident Logs
Operational events, reassignments, and AI reasoning
calendar_month
expand_more
expand_more
filter_list
Total
142
Critical
3
Warning
12
check_circle
Reviewed
85%
| Time | Sev | Type | Ref | Description | Impact | Rev |
|---|---|---|---|---|---|---|
| 10:45 AM | Critical | STAT Delay | ORD-9921 | Traffic on I-35 caused >15m delay. | High | |
| 10:32 AM | Info | AI Reassignment | ORD-10388 | Reassigned from Tech D to Tech A for efficiency. | Positive | |
| 09:15 AM | Warning | Tech Unavailable | TECH-B | Shift ended early (Personal Emergency). | Med | |
| 08:50 AM | Info | Route Optimization | RTE-102 | Batch optimized 4 new orders. | Positive |
Incident Detail
ID: #INC-8832AI Reassignment
Today, 10:32 AM
Order Ref
ORD-10388
Tech Change
Tech D
arrow_forward
Tech A
What Changed
- trending_down ETA reduced by 5 mins
- route Travel reduced by 2.3 miles
psychology AI Reasoning
v2.4.1"Tech A completed their previous job early (10:28 AM). Swapping this order from Tech D saves travel time without violating any hard constraints."
Constraints Check
Skill Match (Phlebotomy)
check_circle
Shift End Buffer
check_circle
Break Schedule
Warning
warning
Assigned despite break warning (Break due in 15 mins).
Score Breakdown
Efficiency Gain
92/100
Service Level Impact
88/100
Top 3 Alternatives Considered
-
1. Keep Tech D Score: 84
Rejected: 4 mins slower arrival time.
-
2. Assign Tech C Score: 65
Rejected: Would cause overtime risk.
-
3. Delay to Batch Score: 40
Rejected: SLA breach likely.